Cable stayed Bridge- MGM

Project data

Location: Gandhinagar, India

2 pylons were constructed with a void of 3.5 m X 3.5 m. upto vertical height of 72 m and enormous angle of 75 degrees.

Requirements

  • Climbing formwork without the use of tie-rods.
  • inclined climbing at an angle of 75 degrees.
  • High safety requirements for the people working above grounds.
  • precise construction requirement to ensure exact cabling of pylons.

Customer

Shapoorji pallonji Constructions limited

 

Customer's benefit

  • Faster construction and lower requirement of man-power.
  • difficult construction carried out easily, precisely and on time.

PERI solution

  • PERI Single Climbing System with crane climbing for optimum utilisation of crane time .
  • Climbing with variable technique to ensure precise cabling.