
For Faster, Safer, and More Efficient Construction
Formwork arrives prelabelled. Teams require minimal supervision. With no need for complex tying or adjustments, site crews can work faster and deliver higher output using fewer trades.
-
No crane requirement
-
No timber or plywood
-
No plastering or patching
-
Higher labour output with less supervision
-
Suitable for zone casting and short cycle times
Monolithic Formwork in action
-
Its adaptable formwork elements suit a wide range of project requirements, offering both accuracy and flexibility on-site.
Made from lightweight aluminum, the system enables easy and quick assembly without the need for cranes, helping reduce labor and equipment demands.
-
The system maximizes the use of standard panels for speed and consistency, while customised corner panels provide the flexibility to suit various designs, delivering the ideal balance of efficiency and adaptability on-site.
-
The system is designed to be efficient to use and as intuitive as possible. The panels require only 6 tie levels to handle 60 kN/m² concrete pressure up to a height of 3.3 m.
After concreting, the flat snap tie can be easily broken 6 mm from the concrete surface, eliminating the need for grouting and curing.
Product data sheet

Interested in using PERI Monolithic for your project?
Call us on +91 (22) 2876 7400 / +91 (22) 69067400 to discuss your requirements further.