The Project
-
GRIDFLEX Slab Formwork System
-
GRIDFLEX Slab Formwork System
Project Information
Mr. Johil Chavda
Director | Chavda Infra
It’s almost been 15 years since we have been using PERI’s products and services. For this special Twin tower project, we required modular formwork system for slabs, walls and columns that is durable, helps to increase our productivity and decrease our cycle time. PERI’s GRIDFLEX system for Slab & Handset Alpha for walls and columns perfectly matches our requirements. Not only we were able to achieve a cycle time of 12 days but also the system uses a prop arrangement such that it helped us in saving costs.
Are you building a project like this?
Call us on +91 (22) 2876 7400 / +91 (22) 6906 7400 to discuss your requirements further.