Homi Bhabha Cancer Hospital, Muzaffarpur
Homi Bhabha Cancer Hospital, Muzaffarpur
Project Information
Requirements
The project required a specialized solution for the construction of four linear accelerator bunkers within the Radiotherapy building. These structures posed unique challenges due to their substantial slab thickness of 2.3 meters, and a floor-to-floor height of 4.5 meters.
The complexity of these specifications necessitated a carefully planned construction approach to ensure both safety and structural integrity.
Solutions
PERI provided a robust solution that included a specially designed PERI SHORE Tower system for the slabs and the Handset ALPHA formwork system for the walls.
This combination was specifically tailored to handle the unique demands of the bunkers. Notably, the team successfully cast the slab for these bunkers in a single pour achieving excellent results without any issues.
Customer benefits
Facilitated the efficient construction of the bunkers
The thoughtful design and safety considerations, combined with the expertise of PERI’s sales and design teams, led to the successful completion of the project.


Mr. Chandu Venkata Ratnam
General Manager | Sivanssh Infrasctructure Development Pvt Ltd
“After brainstorming about design and safety parameters, I finally placed an order for a specially designed PERI Shore Tower system with VT 20 Alpha girders for deck slab and Handset alpha system for walls. During this journey there was a lot of cooperation and deep involvement of the PERI’s sales and design team in finalization of design and supply of systems. “
Are you building a project like this?
Call us on +91 (22) 2876 7400 / +91 (22) 6906 7400 to discuss your requirements further.